Turnkey plug & abandonment, from permit to certification
We manage the full decommissioning lifecycle, from the regulatory filings through the final plugging record, and measure the methane removed on every well.
Our Services
We Lead With Better Systems.

The Hybrid Approach
A conventional P&A job keeps one workover rig on the well from start to finish. For shallower wells, that commits more rig time than the work requires, and rig time is the costly part. The hybrid model divides the job between two units, each suited to its part of the operation.
By the numbers
Emissions intelligence
Measured emissions on every well
Most P&A contractors plug the well and move on. CRS surveys each well with a handheld TDLAS laser detector that reads methane from up to 330 ft away, tags the reading with GPS and photos, and records it in a central database that correlates those readings with historical cementing records and samples taken during drill-out.
For an operator or a state program, that data turns a field into a ranked plugging program and leaves a documented environmental record for each site, useful for compliance, reporting, and proof of the methane reduced.




